Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eded5538/public_html/wp/wp-includes/functions.php on line 6170
ESTA - Edison Consultants project

ESTA

The Emergency Services Telecommunications Authority (ESTA) provides Triple Zero call-taking and dispatch for Victoria Police, Fire Brigade, Ambulance Victoria and the State Emergency Service. The facility is located at Ballarat Technology Park at Federation University and features:

  • 4.5 star energy rating
  • Operations room with full disaster recovery facilities
  • Dual HV network feeders
  • Dual comms network feeders
  • UPS, backup generator and N+1 ancillary systems
  • Fully integrated data/comms with raised floor throughout

Edison Consultants provided full design of all engineering disciplines and assisted with commissioning.


Ballarat