acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eded5538/public_html/wp/wp-includes/functions.php on line 6170Edison Consultants were engaged by the building owners, Karingal, to upgrade the existing air-conditioning system serving the St John of God Pathology Laboratory at Geelong.
A critical factor was to maintain continuous operation of the laboratory that serves Geelong Hospital and operates 20 hours a day / 7 days a week. We provided full design and documentation, as well as assisting Karingal with project management of the works.
Geelong, VIC