Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eded5538/public_html/wp/wp-includes/functions.php on line 6170
Ballarat Day Procedure Centre - Edison Consultants project

Ballarat Day Procedure Centre

Edison Consultants were engaged to provide specialist engineering services for the upgrade of three operating theatres and the associated sterile store areas for this medical facility. Also as part of the works a new air-conditioning system was designed for the Oncology wing and post-op recovery areas.

Our design brief was to upgrade the existing HVAC services to achieve current best practice inline with current codes and standards to provide a top class medical facility for Ballarat.  Our scope of work included the mechanical services and project management of the works.

Client: Cura Day Hospitals Group


Ballarat