Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eded5538/public_html/wp/wp-includes/functions.php on line 6170
Little Creatures Brewery - Edison Consultants project

Little Creatures Brewery

Conversion of a 1920’s red brick woolen mill into a $60m state of the art brewery using German technology. The second stage included a 400-capacity hospitality area. The design retained and re-used the historical building elements wherever possible.

Edison Consultants provided mechanical, electrical & fire services for the Brewery project, as well as the Hospitality project.

Co-generation combined heat and power (CHP) system using gas-fired generators to produce electricity and the waste heat for the brewing process.

  • Client:   Lion Nathan / Little Creatures
  • Project Manager: TGM Group
  • Builder:   Kane Constructions


Geelong, VIC