Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eded5538/public_html/wp/wp-includes/functions.php on line 6170
Mainfreight Epping - Edison Consultants project

Mainfreight Epping

Edison Consultants were engaged through Cardno to provide the mechanical, electrical and specialty design engineering services for the new Mainfreight Warehouse & Distribution Centre at Epping, Victoria.

Comprising of two main areas; the new freight and logistics buildings with a connecting breezeway roof structure, the buildings are more than 36,000m2 internally with administration offices adjacent to both the freight and logistics buildings

We provided the following services:

  • Mechanical: Air-conditioning and ventilation design. BMS throughout the facility with energy and water monitoring capabilities
  • Electrical: Lighting, power, comms and security services
  • Refrigeration: New refrigeration coolroom for luxury items
  • Vertical Transport

Stage 2 comprises an additional 23,000m2 logistics warehouse on a separate allotment with dangerous goods bunkers and refrigerated storage.

Client: Mainfreight

Project Managers: Property-Logic

Head Contractor: Becon Constructions


Melbourne