Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eded5538/public_html/wp/wp-includes/functions.php on line 6170
Murray Goulburn, Smithton - Edison Consultants project

Murray Goulburn, Smithton

This $80 million plant has a processing capacity of 300 million litres or 40,000 tonnes of dairy products per year.

The project involved a new 35m tall evaporator, spray dryer and packaging building with 3 hygiene areas. The building includes a red-line change area, lactose room, control room, MCC, boiler room and transformer yard.

The second stage included a Bulk Fill building with closely monitored temperature & humidity control, filtration and zone pressurisation to maintain hygiene standards.

Edison Consultants worked collaboratively with the principal consultant 4site Engineering