Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/eded5538/public_html/wp/wp-includes/functions.php on line 6170
Newcrest Telfer - Edison Consultants project

Newcrest Telfer

Newcrest is the largest gold producer listed on the ASX and the Telfer Gold Mine is located in the Great Sandy Desert, approx 500km inland from Port Heldland in WA.

ATG Consultants have provided mechanical, electrical and hydraulic engineering services for various projects including:

  • New site operations centre (SAOC)
  • Artesian Bore upgrade with several new pump stations and 6.5km 24″ water main from the borefield to the Raw water dam to support mining operations
  • Upgrade of static water storage tanks and pipe network
  • Upgrade of services at the primary power station and secondary power station

Client: Newcrest Mining


Telfer, WA